Anti-teardown: CycleOps Pro 400

Well, it finally came today. It was originally scheduled for tomorrow, but, well, the lift-gate truck was already gone and the driver of the truck it was put on realized that my house is a residential address and raised his hand.It came in a lot pieces though. (Well, big, easy pieces)The place I got it from would charge almost $130 to put it together for me. I'm not sure why since it took only around 1/2 hour to get it ready to rock and roll on my end. It was easier to get down the basement steps too!  :-PNext up: actually using it![smugmug url="http://photos.vec.com/hack/feed.mg?Type=gallery&Data=21178488_dddHb2&format=rss200" imagecount="100" start="1" num="100" thumbsize="Th" link="lightbox" captions="false" sort="false" window="true" smugmug="true" size="L"] 

Previous
Previous

Prosopagnosia

Next
Next

Chili Cook-off 2012!