More lights!
The other half of the basement is now around 1/2 done, work-wise. Two of the six lights are up... and to make up the other 1/6 I've done the wiring in of the switch and rewiring the existing switch.
More progress!
The other half of the basement is now around 1/2 done, work-wise. Two of the six lights are up... and to make up the other 1/6 I've done the wiring in of the switch and rewiring the existing switch.
More progress!